Phase I – Monopile

  

 

Please find below the HAWC2 model of Phase I – Monopile described in the Offshore Code Comparison Collaboration (OC3) for IEA Task 23. In the model Phase I – Monopile, the NREL offshore 5-MW wind turbine is installed on a monopile with a rigid foundation in 20 m of water.

Start download by clicking on the appropriate link in the 'Download file' column below and select the option 'Save this file to disk'.
Release date Product Version Download file File size
12.06.2013 Phase I – Monopile PhaseIMonopilev30 441 KB
27.02.2012 Phase I – Monopile PhaseIMonopilev20 441 KB
20.10.2011 Phase I – Monopile PhaseIMonopilev10 442 KB
https://www.hawc2.dk/Download/HAWC2-Model/Phase-I-Monopile
22 JANUARY 2022