Phase II - Semisub

    

Please find below the HAWC2 model of Phase II – Semisub described in the Offshore Code Comparison Collaboration Continuation (OC4) for IEA Task 30. In the model Phase II – Semisub, the NREL offshore 5-MW wind turbine is installed on a floating Semisubmersible substructure in 200m of water.

A more detailed description can be found in the paper: A. Robertson, J. Jonkman, M. Masciola, H. Song, A. Goupee, A. Coulling, and C. Luan. (2014). “Definition of the Semisubmersible Floating System for Phase
II of OC4”. Technical report, National Renewable Energy Laboratory (NREL)

Start download by clicking on the appropriate link in the 'Download file' column below and select the option 'Save this file to disk'.

NOTE: In order to run this model HAWC2 version 10.9 or newer is required.

Release date Product Version Download file File size
05.05.2015 Phase II - Semisub Phase_II_Semisub_v_2-0 1006 KB
13.03.2015 Phase II - Semisub Phase_II_Semisub_v_1-0 1006 KB
https://www.hawc2.dk/Download/HAWC2-Model/Phase-II-Semisub
22 JANUARY 2022