Phase III – Tripod

   

 

Please find below the HAWC2 model of Phase III – Tripod described in the Offshore Code Comparison Collaboration (OC3) for IEA Task 23. In the model Phase III – Tripod, the NREL offshore 5-MW wind turbine is installed on a tripod substructure in 45 m of water.

Start download by clicking on the appropriate link in the 'Download file' column below and select the option 'Save this file to disk'.

Release date Product Version Download file File size
12.06.2013 Phase III – Tripod PhaseIIITripodv30 641 KB
27.02.2012 Phase III – Tripod PhaseIIITripodv20 641 KB
20.10.2011 Phase III – Tripod PhaseIIITripodv10 453 KB
https://www.hawc2.dk/Download/HAWC2-Model/Phase-III-Tripod
22 JANUARY 2022